Contract contents
- Goal
- The canonical Task objective.
- Expected scope
- Repository-relative patterns the Task is expected to mutate.
- Protected scope
- Sensitive patterns requiring stronger control.
- Required checks
- Deterministic checks and their human-declared criteria inputs.
Repository-relative paths
Argos normalizes paths and rejects absolute paths, traversal, malformed values and repository escape. The same matcher is used at control and reconciliation time.
Frozen before execution
After execution starts, approval records a deviation but never rewrites intent. Historical Tasks without a contract remain visible without manufactured contracts.